The SPCC Rule and Recent Amendments Click to add your information here 1 Presentation Overview 1. SPCC Rule Applicability and Basics 2. Recent Rule Amendments Overview 3. Compliance Date Extension 4. Additional Information 2

Please note that this presentation is a summary and does not cover every SPCC provision Always refer to the SPCC rule and official Agency guidance found at www.epa.gov/oilspill 3 Section 1. SPCC Rule Applicability and Basics C C SP lan P

4 What is the SPCC Rule? Spill Prevention, Control, and Countermeasure rule Part of the Oil Pollution Prevention regulation (40 CFR part 112) Includes requirements for Facility Response Plans (FRPs) for certain facilities which pose a greater threat to waterways and the environment Purpose To develop plans designed to prevent oil discharges from reaching the navigable waters of the U.S. and adjoining shorelines 5

Requirements of the SPCC rule Requires certain facilities, including farms, to develop and implement a sitespecific SPCC Plan to address: Containment and procedures to prevent oil discharges; Proactive Control measures to keep an oil discharge from entering navigable waters of the U.S. and adjoining shorelines (containment); and Effective Countermeasures to contain, clean up, and mitigate any oil discharge that affects navigable waters of the U.S. and adjoining shorelines (spill response measures). 6 Spill Prevention, Control and

Countermeasure (SPCC) Rule Overview Authority from Clean Water Act Oil Pollution Prevention regulation codified at 40 CFR part 112 Original rule effective in January 1974 Non-delegable to other agencies 7 Rule Applies To NonTransportation Related Facilities Regulations apply to owners and operators of facilities involved in:

Drilling Producing Gathering Storing Processing Refining

Transferring Distributing Using Consuming 8 Examples of Non-TransportationRelated Facilities 9 10 Examples of TransportationRelated Facilities DOT - YES! EPA - NO!

These facilities are subject to authority and control of U.S. Department of Transportation* * Memorandum of understanding between secretary of transportation and Administrator of EPA Nov. 24, 1971. 36 FR 24080 and a summary is found in Appendix A of the SPCC rule 11 Examples of TransportationRelated Facilities 12 What are the SPCC criteria? You must have an SPCC Plan if: Facility stores > 1,320

gallons of oil in aggregate above-ground storage or has 42,000 gallons of completely buried oil storage capacity; and Facility has a reasonable expectation of an oil discharge to waterway or adjoining shoreline. 13 SPCC Applicability Owner/operator makes the initial decision on applicability of SPCC regulations to the facility Does the facility meet the applicability criteria (volumes of oil, expectation to spill to

waterway)? No requirement to submit SPCC Plan to EPA for approval EPA does not formally approve or disapprove of SPCC Plan Plan is required upon inspection during regular workday 14 SPCC Applicability Counted Not Counted 55-gallons or greater

5-gallon container 30-gallon drum Permanently Closed 15 Definitions - Oil Oil, as defined in Section 311 (a)(1) of the CWA, can be of any kind or in any form including, but not limited to - Petroleum and nonpetroleum based oils - Crude Oil - Refined Products

- Animal Fats, and - Vegetable oils 16 Examples of Oil on a Farm Gasoline Off-road and on-road diesel fuel Hydraulic oil Lubrication oil Crop oil Vegetable oils from crops Adjuvant oil Milk* * Milk and Milk product containers are now exempt from the SPCC

capacity calculations and rule requirements 17 Navigable Waterways of the U.S. and Adjoining Shorelines Applicability of the SPCC rule is predicated on a reasonable threat of discharge of oil to navigable waters of the U.S. and adjoining shorelines What are navigable waters of the U.S.? Surface waterways streams, creeks, rivers, lakes Wetlands adjacent to a navigable waterway Nexus important Can be intermittent streams. Best determination if flowing at least seasonally (3 months or more), depending on several factors (see Rapanos Guidance) http://www.epa.gov/owow_keep/wetlands/guidance/CWAwaters.html

Defined flow pathway to truly navigable waters of the U.S. good start in determination dont assume EPA expects to issue guidance on navigable waters of 18 the U.S and adjoining shorelines. Navigable Waters of the U.S. and Adjoining Shorelines Discussion 19 What is a Reasonable Expectation of an Oil Discharge? Initial determination by the owner/operator

based on geographical and location aspects of the farm You may consider proximity to water, land contour, drainage Exclude manmade features, such as secondary containment dikes around tanks and impoundments, in determination Good idea to document determination - Particularly if you conclude you are not subject to the rule - Not a rule requirement See Section 2.4 of SPCC guidance document 20 21

Facility Facility- any mobile or fixed, onshore or offshore building, property, parcel, lease, structure, installation, equipment, pipe, or pipeline (other than a vessel or a public vessel) used in oil well drilling operations, oil production, oil refining, oil storage, oil gathering, oil processing, oil transfer, oil distribution, and oil waste treatment, or in which oil is used, as described in Appendix A to this part. The boundaries of a facility depend on several site-specific factors, including but not limited to, the ownership or operation of buildings, structures, and equipment on the same site and types of activity at the site. Contiguous or non-contiguous buildings, properties, parcels, leases, structures, installations, pipes, or pipelines under the ownership or operation of the same person may be considered

22 What the definition means According to EPA guidance, the extent of a facility depends on sitespecific circumstances: - Ownership, management, and operation of the buildings, structures, equipment, installations, pipes, or pipelines on the site; - Similarity in functions, operational characteristics, and types of activities

ator the site; - occurring Adjacency; - Shared drainage pathways (e.g., same receiving water 23 bodies). Farm The definition of a farm was promulgated in the December 2006 rule amendments because, at the time, EPA delayed the compliance date for farms until additional amendments to the rule were promulgated. Additional amendments were promulgated in 2008 and farms now have the same compliance dates as other facilities.

Farm - A facility on a tract of land devoted to the production of crops or raising of animals, including fish, which produced and sold, or normally would have produced and sold, $1,000 or more of agricultural products during a year. 24 What the definition means A farm is a type of facility Note: You may be subject to the SPCC rule because you meet the definition of a facility; you must determine oil storage capacity and reasonable expectation of an oil discharge like any other facility

25 Permanently Closed SPCC rule exempts any oil storage container that is permanently closed. Permanently closed means any container or facility for which: (1) All liquid and sludge has been removed from each container and connecting line; and (2) All connecting lines and piping have been disconnected from the container and blanked off, all valves (except for

ventilation valves) have been closed and locked, and conspicuous signs have been posted on each container 26 Permanently Closed (cont.) (cont.) Definition of permanently closed does not require a container to be removed from a facility. Permanently closed containers may be brought back into use as needed for variations in production rates and economic conditions. Permanent closure requirements under the

SPCC rule are separate and distinct from the closure requirements in regulations promulgated under Subtitle C of RCRA. SPCC rule exempts any oil storage container that is permanently closed. A tank that has either never stored oil, or has been permanently closed, and arrives at a facility is not counted until the tank is actually 27 Key SPCC Requirements Prepare Plan in accordance with Good Engineering Practices Full approval of management to implement Plan and sign off Follow sequence of Section 112.7, or use a

cross-reference section 28 SPCC Key Requirements SPCC regulations requires preparation and implementation of a written Plan to address: Operating procedures for routine handling of products to prevent a discharge of oil Discharge or drainage control measures to prevent a discharge of oil Countermeasures to contain, clean up, and mitigate an oil spill Methods of disposal of recovered materials Contact list and phone numbers of company, contract response personnel, and National Response Center

29 Key SPCC Requirements For farms with >10,000 gallons of oil, Plans are required to be certified by a Professional Engineer (PE) For farms with > 1,320 up to 10,000 gallons of oil, can opt to self-certify SPCC Plans Details to follow (Qualified Facilities) This is optional alternative to PE certification Two tiers of certification 30 Professional Engineer (PE) Certified by a licensed PE Licensed in state or state with reciprocity

PE familiar with 40 CFR Part 112 PE or agent visited facility In accordance with good engineering practices Consider applicable industry standards In compliance with regulations Inspection and testing procedures are established Plan is adequate for facility 31 Failure Analysis Where experience indicates reasonable potential for equipment failure

Tank loading or unloading equipment Tank overflow, rupture, or leakage Any other equipment known to be a source of a discharge Predict for each type: Direction (e.g., north, or to the road) Rate of flow Total quantity of oil that could be discharged 32 Amendment of SPCC Plan by Owners or Operators For changes in facility design, construction, operation, or maintenance that materially affect the potential for a discharge as described in 112.1(b)

Commissioning and decommissioning containers Replacement, reconstruction, or movement of containers Reconstruction, replacement, or installation of piping systems Construction or demolition that might alter secondary containment structures Changes in product or service Revision of operating or maintenance procedures Amend within 6 months; implement ASAP, 33 Plan Review Complete review and evaluation of Plan Once every 5 years from the date facility

becomes subject to the rule If a facility was in operation on or before 8/16/2002, five years from the date of your last review required by the rule Does not always require a PE Amend Plan within 6 months to include more effective prevention and control technology Implement ASAP, but no later than 6 months of amendment 34 Documenting Plan Review Must document Plan review and evaluation Sign statement at beginning or end of

Plan or in a log or an appendix I have completed review and evaluation of the SPCC Plan for (name of facility) on (date), and will (will not) amend the Plan as a result. PE must certify any technical amendment to Plan Qualified Facilities exception 35 SPCC Rule Key Requirements SPCC Plan must be maintained at facility if manned 4 hours/per day or more, or at nearest field office if manned less than 4 hours/per day Allowance of usual and customary business records to serve as records of

inspection or tests 36 Inspections, Tests, and Records Conduct inspections and tests in accordance with written procedures developed by the facility or by the engineer who certifies the facility Plan Keep these written procedures and a record of the inspections and tests, signed by the appropriate supervisor or inspector, with the SPCC Plan for a period of three years 37 Environmental Equivalence

Allows deviations from most technical requirements of the rule when: Equivalent environmental protection is provided and reasons for non-compliance explained Does not include secondary containment, training, recordkeeping, and administrative provisions of the rule 38 Training Train oil-handling personnel Operation/maintenance of prevention equipment Discharge procedure protocols Applicable pollution control laws, rules, and regulations

General facility operations Contents of the facility SPCC Plan Designate person accountable for discharge prevention and who reports to facility management Schedule/conduct at least one briefing/year: 39 General Secondary Containment Provide appropriate secondary containment and/or diversionary structures or equipment to prevent a discharge (from tanks, drums, totes, piping, etc.) to navigable waters of the

U.S. and adjoining shorelines The entire system (walls and floor) must be capable of containing oil so that a discharge from containment will not occur until cleanup occurs 112.7(c) 40 General Secondary Containment One of the following preventive systems or its equivalent should be used as a minimum for onshore facilities: Dikes, berms or retaining walls sufficiently impervious to contain spilled oil Curbing or drip pans Sumps and collection systems

Culverting, gutters or other drainage systems Weirs, booms or other barriers Spill diversion ponds Retention ponds Sorbent materials 41 42 Revision to General Secondary Containment Requirement Clarified that the general secondary containment requirement is intended to address the most likely oil discharge from any part of a facility Use of active and passive secondary containment,

such the asmethod, spill kits, New text: In determining design,allowed and capacity for secondary containment, you need only to address the typical failure mode, and the most likely quantity of oil that would be discharged. Secondary containment may be either active or passive in design. Modifies 112.7(c) to expand the list of example prevention systems for onshore facilities Additional examples: drip pans, sumps, and collection 43

Secondary Containment Active Measures Can use active measures as secondary containment Active measures are those that require deployment or a specific action by an operator These may be deployed either before an activity involving the handling of oil starts, or in reaction to a discharge Must be implemented in time to prevent the spilled oil from reaching surface waters 44

Active Measures May be appropriate for discharges that occur during manned activities if they: Can contain the volume and rate of oil Is properly constructed Is deployed in a timely manner Examples include: Using spill kits in the event of a discharge Placing a properly designed storm drain cover over a drain prior to a transfer of oil to a container 45

General Secondary Containment General Secondary Containment requirement applies to the following examples: Nurse tanks Mobile refuelers Oil-filled equipment (transformers, manufacturing equipment, etc.) Transfer areas Piping runs/racks, manifolds, etc. Truck loading/unloading areas (not loading rack) No specific-sized volume requirement Sizing based on typical spill size not container size

46 Specific Secondary Containment Requirements Specific minimum size requirement for secondary containment for: Bulk storage containers Mobile or portable bulk storage containers* The secondary containment must be sized to contain the largest single oil compartment or container plus sufficient freeboard to contain precipitation * Certain mobile portable containers (tanker trucks and nurse tanks) are only required to have general secondary containment

47 Specific Secondary Containment For Bulk Storage containers, sized containment could be an earthen berm, concrete dike or earthen remote impoundment See Chapter 4 of SPCC Guidance Document (Figures 4-5 and 4-6) http://www.epa.gov/emergencies/docs/oil/spcc/ guidance/ 4_SecondaryContainment_Impracticability.pdf Sample Calculation Worksheets are also available on the EPA Website (for Qualified

Facilities) 48 49 Bulk Storage Container Requirements No container should be used for the storage of oil unless its oil and construction are compatible with the oil stored and the conditions of storage, such as pressure and temperature, etc. For bulk storage tank installations, provide secondary containment for the entire capacity of the largest single container with sufficient freeboard for

precipitation 50 Inadequate Containment and Improper Tank Use (UST serving as an AST) 51 Bulk Storage Containers Overfill Protection. Provide at least one of the following devices: High liquid level alarms High liquid level pump cutoff Direct audible or code signal communication between container gauger and pumping station Fast-response system for determining liquid

level of each bulk storage container, with person present to monitor Regularly test liquid level sensing devices (follow manufacturers specifications) 52 Inadequate Containment and Overfill Protection 53 Facility Drainage Drainage from diked storage areas should be: Restrained by valves or other positive means Use valves that are manual and open-andclosed in design Emptied by pumps or ejectors that are

manually activated and inspected before starting to verify that no oil will be discharged into navigable waters of the U.S. and adjoining shorelines. 54 Facility Drainage (cont.) (cont.) Drainage from undiked areas should flow into: Ponds; Lagoons; or Catchment basins designed to retain oil or return it to the facility. Catchment basins should not be located

in areas subject to periodic flooding If plant drainage is not engineered as above, the final discharge of all in-plant ditches should be equipped with a diversion system that could, in the event 55 56 Tank Truck Loading/Unloading Rack Secondary Containment is required for a loading rack Must be sized to volume of the single

largest compartment on tank truck Physical barrier system, wheel chocks, warning signs, etc. required Examination of the trucks lowermost drains, outlets Typically racks are not 57 Loading/Unloading Areas If there is not a loading rack, but a loading area then 112.7(c) general

containment is required (no specific size volume required) You determine amount most likely to be spilled, then provide secondary containment for that volume 58 Oil-Filled Operational Equipment Equipment that includes an oil storage container (or multiple

containers) in which the oil is present solely to support the function of the apparatus or the device Not considered a bulk storage container Does not include oil-filled manufacturing equipment Examples: hydraulic systems, lubricating systems, gear boxes, machining coolant systems, heat transfer systems, transformers, circuit breakers, electrical switches, other systems containing oil solely to enable

59 Qualified Oil-Filled Operational Equipment Alternative to the general secondary containment requirements for qualified oilfilled operational equipment: Prepare an oil spill contingency Plan and a written commitment of manpower, equipment, and materials Have an inspection or monitoring program to detect equipment failure and/or a discharge (112.7(k)) Must meet eligibility criteria 60

Qualified Oil-Filled Operational Equipment Eligibility Criteria For the 3 years prior to Plan certification, or since becoming subject to the Rule if it has operated for less than 3 years, the facility must not have had: A single 112.1(b) discharge of oil from any oil-filled operational equipment exceeding 1,000 U.S. gallons; or Two 112.1(b) discharges of oil from any oilfilled operational equipment each exceeding 42 U.S. gallons within any 12-month period. The gallon amount(s) specified (either 1,000 or 42) refers to the amount of oil that actually reaches navigable waters of the U.S. and adjoining shorelines not the total amount of oil spilled. The entire volume of the discharge is oil for the purposes of this

reporting requirement. 61 Facility Transfer (Piping) Operations Conduct regular inspections of all aboveground valves, piping, and appurtenances Assess general condition of items such as flange joints, expansion joints, valve glands and bodies, catch pans, pipeline supports, locking of valves, and metal surfaces Conduct integrity and leak testing of buried piping at time of installation, modification, construction, relocation, or replacement 62

63 Section 2. Recent Rule Amendments Overview 64 SPCC Rule Compliance Dates for Farms A Farm starting operation... Must...

On or before August 16, 2002 Maintain its existing SPCC Plan Amend and implement the amended SPCC Plan no later than May 10, 2013 After August 16, 2002 through May 10, 2013 Prepare and implement an SPCC Plan no later than May 10, 2013 After May 10, 2013

Prepare and implement an SPCC Plan before beginning operations 65 SPCC Amendments Related to Farms Exempted pesticide application equipment and related mix containers Exempted heating oil containers at single-family residences Exempted motive power containers Exempted milk or milk product containers Clarified that farm nurse tanks are mobile refuelers 66

SPCC Amendments Related to Farms Amended the definition of facility Modified secondary containment requirement language at 112.7(c) to provide more clarity and flexibility Simplified security requirements Amended tank integrity testing requirements to allow greater flexibility 67 SPCC Amendments Related to Farms Clarified definition of permanently closed tanks and status of new tanks with no fuel added Clarified applicability of the rule to manmade structures

Added option to allow a self-certified Plan for a "qualified facility" and divided facilities into tiers 68 Pesticide Application Equipment Exempt equipment includes: Ground boom applicators Airblast sprayers Specialty aircraft that apply measured amounts of pesticides to crops and/or soil Related mix containers

Exemption applies to all pesticide application equipment and related mix containers, regardless of ownership or where used 69 Residential Heating Oil Containers Residential heating oil containers at single-family residences are exempt from the SPCC rule Applies to containers that

are: Aboveground or completely buried Located at a farm or singlefamily residences Used solely to store heating oil used to heat the residence SPCC requirements continue to apply to oil containers 70 Motive Power Containers Defined as any onboard storage containers used primarily to power the movement of a motor

vehicle Includes self-propelled agricultural, construction, and excavation vehicles; and self-propelled cranes Oil transfer activities occurring within an SPCC-regulated facility 71 Milk and Milk Product Container Exemption All milk and milk product containers, associated piping and appurtenances are exempt from the SPCC rule

Excluded from facility oil storage capacity calculation when determining SPCC applicability Exemption also includes all milk handling and transfer activities Milk product examples include cheese, yogurt and ice cream Immediately report milk and other oil spills to navigable waters or adjoining shorelines to the National Response Center

(NRC) at 800-424-8802 or 202-426-2675 Does not impact the potential liability of milk spills 72 Farm Nurse Tanks Preamble Clarification Nurse tanks are mobile/portable containers used at farms to store and transport fuel for transfers to or from farm equipment and to other bulk storage containers The definition of mobile refueler includes nurse tanks, as well as non-road licensed refueling equipment that are used to refuel farm equipment

in the fields Nurse tanks are excluded from sized secondary containment 112.7(c)- design for "most likely" spill Must (e.g. meetspill general secondary containment kits may be requirements at adequate) Identify the home base in Plan 73

Security Requirements A facility owner/operator is required to describe in the SPCC Plan how he will: Secure and control access to all oil handling, processing and storage areas; Secure master flow and drain valves; Prevent unauthorized access to starter controls on oil pumps; Secure out-of-service and loading/unloading connections of oil pipelines; and Address the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges. 74 Inspections and Integrity Testing

Proposed changes at: 112.8(c)(6) and 112.12(c) (6) SPCC rule requires routine inspections and tank integrity testing 2008 amendments provides flexibility in complying with bulk storage container

(tanks, drums and totes) inspection and integrity testing 75 Inspections and Integrity Testing 2008 amendments and flexibility: Proposed changes at: 112.8(c)(6) and 112.12(c) (6)

Requires an owner or operator to consult and rely on industry standards to determine the appropriate qualifications for tank inspectors/testing personnel and the type/frequency of integrity testing required for a particular container size and configuration Enables facilities to easily adjust Plans to reflect changes in industry standards Example industry standards: American Petroleum Institute (API) 653 (www.api.org) 76 Steel Tank Institute SP001 Summary of Inspection Requirements

Drums and totes (portable containers): Periodic visual inspections, as long as sized secondary containment provided; typically monthly, can be weekly, etc. Tanks: Periodic visual inspections by the owner/operator plus formal inspections based on the industry integrity testing standard that is used. Visual inspections are typically performed monthly, can be weekly, etc. Piping: Periodic visual inspections by the owner/operator, typically monthly, can be weekly, etc. Fuel transfer areas: Visual inspections by the owner/operator during transfers, typically monthly,77 Manmade Structures: Preamble Clarification

Certain manmade features may be taken into consideration in determining how to comply with SPCC requirements SPCC Plan preparer can consider: The ability of building walls and/or drainage systems to serve as secondary containment for a container Freeboard for precipitation not necessary if container is indoors Indoor conditions that reduce external corrosion and potential for discharges, to develop a sitespecific integrity testing and inspection program 78 Qualified Facilities An Overview A qualified facility is a smaller oil storage facility that is eligible for streamlined

regulatory requirements Self-certified SPCC Plan instead of one reviewed and certified by a Professional Engineer Must meet eligibility criteria This group of facilities divided into two tiers Tier I - complete a self-certified SPCC Plan following a template Tier II - prepare and self-certify an SPCC Plan 79 Qualified Facilities Eligibility Criterion #1: Storage Capacity Facility must have 10,000 gallons or less in

aggregate aboveground oil storage capacity If the facility capacity increases above 10,000 gallons, then a PE must certify the Plan within 6 months of capacity change 80 Qualified Facilities Eligibility Criterion #2: Reportable Discharge History For the 3 years prior to Plan certification, or since becoming subject to the rule if it has operated for less than 3 years, the facility must not have had: A single discharge of oil to navigable waters of the U.S. and adjoining shorelines exceeding

1,000 U.S. gallons; or Two discharges of oil to navigable waters or adjoining shorelines each exceeding 42 U.S. gallons within any 12-month period. The gallon amount(s) specified (either 1,000 or 42) refers to the amount of oil that actually reaches navigable waters of the U.S. and adjoining shorelines not the total amount of oil spilled. The entire volume of the discharge is oil for the purposes of this reporting 81 Qualified Facilities Eligibility (cont.) (cont.) Criterion #2: Reportable Discharge History Oil discharges that result from natural disasters, acts of war, or terrorism are not

included Oil discharges that result from vandalism are included 82 What if you have a spill? Spills of oil to navigable waters of the U.S. and adjoining shorelines must be immediately reported to the National Response Center (NRC) at 800-4248802 or 1-202-426-2675 Facilities that have a reportable oil discharge after self-certifying the SPCC Plan do not

automatically lose eligibility However, the Regional Administrator has the authority to require a PE 83 certified Plan Qualified Facilities SelfCertification Facilities that meet the eligibility criteria are able to prepare and self-certify an SPCC Plan as Tier II qualified facilities Self-certified SPCC Plans must follow the rule requirements Cannot deviate from rule requirements UNLESS

A PE certifies the environmentally equivalent alternative and/or contingency plan for secondary NOTE:substituting Some states require a PE containment to certify SPCC Plans (hybrid Plan- Tier II facilities only) 84 Self-Certification Attestation Owner/operator certifies that: The Plan has been prepared in accordance with accepted and sound industry practices and standards and with the rule requirements

Procedures for required inspections and testing have been established The Plan is being fully implemented The facility meets the qualifying criteria The Plan does not deviate from rule requirements except as allowed and as certified by a PE Management approves the Plan and has 85 Tier I Eligibility Criteria Meet the Tier II qualified facilities eligibility criteria: 10,000 gallons maximum facility aboveground oil storage capacity; In the 3 years prior to Plan certification, no spills to navigable waters of the U.S. and

adjoining shorelines: greater than 1,000 gallons or no two spills greater than 42 gallons in a 12-month period; and Have no oil storage containers with an individual aboveground storage capacity greater than 5,000 U.S. gallons86 Tier I Qualified Facilities Option to complete a self-certified SPCC Plan template instead of a full SPCC Plan A Tier I qualified facility owner/operator can choose to comply with either Tier I or Tier II requirements or prepare a PE-certified Plan in accordance with all applicable requirements of 112.7 and subparts B and C Template is found in Appendix G to the SPCC rule

Template is designed to be a simple SPCC Plan Cannot be a hybrid Plan (i.e., no PE-certified environmental equivalence or contingency plan instead of secondary containment) 87 Tier I Template Available at: http://www.epa.gov/osweroe1/content/spcc/tier1tem p.htm 88 Summary: Qualified Facilities

If the Applicability facility total aboveground oil storage capacity is 10,000 gallons or less And Within three years prior to the Plan certification date, or since becoming subject to the SPCC rule if in operation for less than three years, the facility has not discharged oil to navigable waters of the U.S. and adjoining shorelines in: A single discharge exceeding 1,000 gallons, or

Two discharges each And the facility has Then the facility is a: Tier I Qualified Facility: No individual aboveground oil containers greater than 5,000 gallons; Any individual aboveground oil container

greater than Complete and self-certify Plan template (Appendix G of SPCC rule) instead of a full PE-certified Plan or other self-certified SPCC Plan. Tier II Qualified Facility: Prepare a self-certified Plan in accordance with all applicable requirements of 112.7

89 Plan Requirements for Farms with >10,000 gallons of oil SPCC Plan must be certified by a Professional Engineer (PE) State PE licensing boards typically require PEs to have expertise in area of practice in order to stamp plans and construction documents Plan must include PE attestation PEs should not use Tier I template to complete SPCC Plan Plan must follow rule requirements in 40 CFR parts 112.7 and 112.8. 90

SPCC Rule Compliance Dates On October 18, 2011, EPA amended the date by which farms must prepare or amend and implement their Spill Prevention, Control, and Countermeasure (SPCC) Plans, to May 10, 2013 All non-farm facilities are now required to be in compliance with the SPCC rule amendments 91 SPCC Rule Compliance Dates for Farms A Farm starting operation... Must...

On or before August 16, 2002 Maintain its existing SPCC Plan Amend and implement the amended SPCC Plan no later than May 10, 2013 After August 16, 2002 through May 10, 2013 Prepare and implement an SPCC Plan no later than May 10, 2013 After May 10, 2013

Prepare and implement an SPCC Plan before beginning operations 92 Section 4. Additional Information 93 Outreach Tools SPCC farm factsheets and blank Tier I template on EPAs oil website: http://www.epa.gov/emergencies/content/spcc/ index.htm

General SPCC Blue Book on website also Example Tier I template for farms SPCC Green Book (in the works) HOTLINE: Superfund, TRI, EPCRA, RMP, and Oil Information Center (800) 424-9346 94 SPCC Blue Book Available at: http://www.epa.gov/oem/docs/oil/spcc/spccbluebroch.pdf 95 Reporting of Oil Spills Report all oil discharges to navigable waters of the U.S. and adjoining shorelines to NRC at 1-800-4248802

Federal government's centralized reporting center, which is staffed 24 hours a day by U.S. Coast Guard personnel Any person in charge of a vessel or an onshore or offshore facility must notify NRC immediately after he or she has knowledge of the discharge NRC relays information to EPA or U.S. Coast Guard depending on the location of the incident An On-Scene Coordinator evaluates the situation and decides if federal emergency response action is 96 necessary Specific SPCC Spill Reporting Requirements Report to the EPA Regional Administrator (RA) when there is a discharge of:

More than 1,000 U.S. gallons of oil in a single discharge to navigable waters of the U.S. and adjoining shorelines More than 42 U.S. gallons of oil in each of two discharges to navigable waters of the U.S. and adjoining shorelines within a 12-month period When making this determination it is the amount of the discharge in gallons that reaches navigable waters of the U.S. and adjoining shorelines An owner/operator must report the discharge(s) to the EPA Regional Administrator within 60 days 97 For More Information EPAs SPCC web page http://www.epa.gov/emergencies/content/spcc/ index.htm

EPA Oil Spill and Emergency Management web pages www.epa.gov/oilspill www.epa.gov/emergencies HOTLINE: Superfund, TRI, EPCRA, RMP, and Oil Information Center (800) 424-9346 or (703) 412-9810 TDD (800) 553-7672 or (703) 412-3323 www.epa.gov/superfund/resources/ 98 SPCC Contacts REGION SPCC COORDINATORS

AG CONTACTS Rob Koethe (617) 9181535 [email protected] Andrea Szylvian (617) 9181198 [email protected] 1 CT, RI, MA, NH, VT, ME Alex Sherrin (617) 9181252 [email protected] 2 NJ, NY, PR, VI

Larry DAndrea (732) 9066964 [email protected] Kristina Heinemann (212) 6373857 [email protected] Arlin Galarza-Hernandez (215) 8143223 [email protected] John Butler 2127 [email protected] Ted Walden

(404) 5628752 [email protected] Denise Tennessee (404) 5628460 [email protected] 3 PA, WV, VA, MD, DC 4 KY, NC, TN, SC, MS, AL, GA, FL 5 MN, WI, MI, IL, IN, OH 6

NM, TX, OK, AR, LA Mick Hans 5050 [email protected] (312) 353- Don Smith (214) 6656489 [email protected] Chris Perry (214) 6656702 [email protected] (215) 814-

Tom Davenport (312) 8860209 [email protected] Gerald Winn (312) 8862777 [email protected] Randy Rush (214) 6657107 [email protected] Karen Flournoy (913) 551- 99

SPCC Contacts (cont.) (cont.) REGION 8 MT, ND, SD, WY, UT, CO 9 CA, NV, AZ, HI, Guam, American Samoa, Northern Marina Islands 10 WA, OR, ID, AK HQ- Office of Emergency Management: HQ- Office of Civil

Enforcement: HQ- Office of Compliance: SPCC COORDINATORS AG CONTACTS Melissa Payan (303) 312-6511 [email protected] Jennifer Meints (303) 312-6334 [email protected] Pete Reich

[email protected] Janice Witul [email protected] Kerry Drake (415) 947-4157 [email protected] Don Hodge (415) 972-3240 [email protected] (415) 972-3052 (415) 972-3089 WA: Mike Sibley (206) 553-1886 [email protected]

OR, ID: Richard Franklin (503) 326-2917 [email protected] AK: Matt Carr (907) 271-3616 [email protected] Mark Howard (202) 564-1964 [email protected] Patricia Gioffre (202) 564-1972 [email protected] Troy Swackhammer (202) 564-1966 [email protected] David Drelich (202) 564-2949 [email protected] Kelly Brantner (202) 564-9933 [email protected]

Karma Anderson (206) 553-1647 [email protected] Ag Center: Ginah Mortensen (913) 551-5028 [email protected] Carol Galloway (913) 551-5092 [email protected] Dan Chadwick (202) 564-7054 [email protected]

100 Questions? 101

Recently Viewed Presentations

  • TNM Staging: Breast - University of Kentucky

    TNM Staging: Breast - University of Kentucky

    T2 (above dotted line) is defined as tumor more than 20 mm but not more than 50 mm in greatest dimension, and T3 (below dotted line) is defined as tumor more than 50 mm in greatest dimension. Compton, C.C., Byrd,...
  • Summary of the U.S. Task Force on United

    Summary of the U.S. Task Force on United

    Each United Way will have an important role to play in defining the future. I'd close by highlighting two key points as excerpted from the Report … It's time for us - as a network - to generate action and...
  • Interactions with the Physical Environment

    Interactions with the Physical Environment

    Climate regions and characteristics of Canada- LOWERN. Continental and Maritime, Climate Graphs, regional characteristics. Quiz Breakdown. Knowledge-Terms/Concepts- Matching. Thinking/Inquiry-Analysis and Evaluation- Maps, Climate Graphs. Communication-
  • The double blind, randomized, placebo-controlled trial: Gold ...

    The double blind, randomized, placebo-controlled trial: Gold ...

    Randomly subjecting a person to a milieu of hidden exposures and then spolighting him or her with relentless observation does not nurture normalcy, nor does it isolate humans from their mental processes. They are not immune to any "unconscious" processes...
  • CS 4700 / CS 5700 Network Fundamentals Lecture

    CS 4700 / CS 5700 Network Fundamentals Lecture

    Trackerless Torrents. New versions of BitTorrent have the ability to locate swarms without a tracker. Based on a P2P overlay. Distributed hash table (DHT) Recall: peers located via DHT are given "H" state. ... Low Extra Delay Background Transport.
  • Reggio Emilia from theory to facts - tri-association.org

    Reggio Emilia from theory to facts - tri-association.org

    Reggio Emilia: From Theory to Reality. Welcome, my name, where I come from, what I do, why I'm here. Today I will be sharing with you our experiences with the implementation of the Reggio philosophy. The important thing to remember...
  • GSC MSTF Report - TT

    GSC MSTF Report - TT

    Become a global source of valuable information coming from an eclectic range of sources, both traditional and non-traditional players in the M2M standards arena (in particular vertical market groups, fora and associations). Develop a repository of non-commercial M2M information through...
  • IBM System z Community Update - Virginia Tech

    IBM System z Community Update - Virginia Tech

    IBM Academic Initiative, System z The need for IT professionals is greater than ever Newly declared computer-science majors down 32% The number of job openings for IT professionals nationwide has increased by 47.6% from 2004 to 2006.