UPGRADE MOORING FACILITIES JETTY 1 + 2 NUSTAR TERMINAL GRAYS (LONDON) DESIGN, TENDER AND RISK MEETING DD 25 JANUARY 2017 1

AGENDA 1. 2. 3. 4. 5.

6. 7. Actual design and scope Presentation Works Methods and equipment Schedule RISKS (and Opportunities)

Offer date: mid February Contract format (technical, legal, financial conditions) Local and Nustar regulations (safety) 2 SCOPE

1. Dredging appr. 6000 m3 including land disposal (DEC) 2. 8 pc. Breasting Dolphins with fender panels 3. 8 pc. Mooring Dolphins 4. 12 pc. Quick Release Hooks 5. 2 pc Landing Stages for ship gangways 6. Removal of old fender structures 7. Interconnecting bridges to breasting dolphins

8. New pipe bridges/walkway from shore to jetty 1 (partly) 9. Lifting activities for Marine Loading Arms (MLAs) 10.New foundation on jetty platform for MLAs 11. Installation task lights and navigational lighting 3

ACTUAL DESIGN 4 ACTUAL DESIGN 5

ACTUAL DESIGN 6 ACTUAL DESIGN (JETTY 1)

7 DREDGING AREA 8 DREDGING AREA (EXTENDED

CLIENTS/PLAS DECISION) 9 MIDDLE MOORING DOLPHIN CONFIGURATION (PLAS WISHES)

10 MIDDLE MOORING DOLPHIN CONFIGURATION 11

BREASTING DOLPHINS 12 MOORING DOLPHINS 13

MARINE LOADING ARMS 14 WALK WAY / PIPE BRIDGE

15 METHODS / EQUIPMENT 16

METHODS / EQUIPMENT 17 METHODS / EQUIPMENT 18

METHODS / EQUIPMENT 19 METHODS / EQUIPMENT

20 METHODS / EQUIPMENT 21

METHODS / EQUIPMENT 22 METHODS / EQUIPMENT

23 RISKS 24 CONTRACT FORMAT AND CONDITIONS

FIDIC yellow with conditions Clients responsibilities: Permits and licenses and applications Functional requirements (BOD) UXOs/ obstacles in underground (ship wrecks, unknown construction) Jettys free in time and undisturbed execution not stopped or hindered by Nustar activities

Correctness of documents made available by client Correctness of soil data made available by client (not the interpretation) Piping and E & I works Delivery of MLAs Safety coordination on site Basic survey of existing construction 25

CONTRACT FORMAT AND CONDITIONS FIDIC yellow with conditions Contractors responsibilities: Technical requirements (BOD) General and detail design Execution within schedule (excl. influence of extreme weather)

Quality control according to Eurocode RC2/CC2 Steelworks performed according tot NEN 1090 (CC2) Safety management of works within DEME scope according to Nustar regulations Execution according to (known) requirements coming from Port (PLA) and permit requirements (noise measurement, slow start, starting time for piling)

26

Recently Viewed Presentations

  • Chapter 1 Background

    Chapter 1 Background

    What is a Computer? A computeris an electronic device, operating under the control of instructions stored in its own memory, that can accept data, process the data according to specified rules, produce results, and store the results for future use.....
  • 2015 Board of Directors - AHIA

    2015 Board of Directors - AHIA

    2015 Strategic Initiatives. Integrate Evolving Competencies to strengthen AHIA member resources and develop Communities of Practice. Implement an interactive, O. nline Collaboration . platform within the website to promote . Subject Matter Leadership
  • GE 115, Section 11

    GE 115, Section 11

    With Aspen Rate-Based Distillation feature, RadFrac can perform rate-based distillation calculations (packed tower configurations).
  • MS - Toolbox presentation - 2013 - Exploration roadshow ...

    MS - Toolbox presentation - 2013 - Exploration roadshow ...

    For example, if an employee obtained a forklift truck (LF) high risk work licence for a small warehouse forklift, inside a warehouse on a concrete floor; they would be required to verify their competence on site when using a different...
  • Reliability validity - Chiro

    Reliability validity - Chiro

    Reliability and Validity Designs ... Ensnarement by diagnostic classification schemes Vague diagnostic criteria and the tendency to pigeon-hole patients Entrapment by prior expectation Tendency for examiners to find what they hope to find (e.g., chiropractors find back problems, urologists find...
  • Question: 36 marks; 45 mins AQA Moon on

    Question: 36 marks; 45 mins AQA Moon on

    This kind of language, and the poet's use of caesura, convey the idea that the woman is now solely defined by her sexuality and status as a wife; it is interesting that the lively metaphors at the beginning of the...
  • Insights 2016 - Windham Brannon

    Insights 2016 - Windham Brannon

    Prior to this, going concern accounting was in audit and SSARS Standards. FASB started out with a "Business Risks" approach to going concern. FASB later moved to a 12 month - 24 month model. FASB ended with a Standard very...
  • First Quarter Summary

    First Quarter Summary

    , is in a state won by Democrats in the 2012 or 2016 presidential elections. No other GOP-held seat appears in danger, which means . Republicans are likely to hold onto their majority. Democrats will likely be on defense in...